  • A wind tunnel, powerful enough, at least 4 meters of glass and a clean airflow
  • 2 or 4 Led stripes and a DynamR Judging System
  • A four wires cable going from the antichamber to the control booth for door sensor(s)
  • 1 laptop to use the judging system
  • 2 BIG TV screens vertically positioned
  • Duct tape
  • 1 screen for timer displaying to audience + 1 DynamR Kiosk or another computer

  • Videos :
    • A TUNN3L Video System
    • Or :
      • 2 High Définition Cameras, with HDMI output, power supply and HDMI
      • At least 2 HDMI cables (from cameras to screens), for live video streaming (judges)
      • A video backup system in case of need for video review :
        • Any video recording system from cameras to a NAS for example, with access to this server for judges
        • Low cost option : Go Pro App (Capture©) on smartphone/tablet to control the cameras (start/stop record, review …) => review will be done by reading the SD cards
      • Camera’s support (Tripods, suction cups …)
  • 2 tables / 5 chairs
  • A coffee machine
  • More duct tape
  • Enough beers 😉

Setup

  • Plug everything,
  • Wait 5 minutes,
  • If smoke or fire :
    • unplug
    • replug
    • wait 5 minutes
  • Else :
    • Have a beer